150 kW• Ultra-fastHorario habitualActive in MITECO registry

GUAW VITORIA

Düsseldorf Kalea,2, Vitoria-Gasteiz (01010), Araba/Álava, Spain
Network OperatorREMO SUSTAINABLE MOBILITY S.L
Total Capacity1 bay (2 plugs)
GPS Coordinates42.85418, -2.71079
Official IDGP7WVAS6LBXUAPWAF3FQ
Official Registry DateFeb 12, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Vitoria-Gasteiz, belonging to the province of Araba/Álava (País Vasco, Spain). The charging equipment and commercial operation belong to the REMO SUSTAINABLE MOBILITY S.L network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
CCS Combo 2
⚡ 800V150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeGP7WVAS6LBXUAPWAF3FQ
Post / EVSE Identifier #1L4F7OB7PZTU8NZNDOTRHJLGOFSE
Post / EVSE Identifier #2ES*RSM*E000000000250
Post / EVSE Identifier #31444
Post / EVSE Identifier #41445

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

Sabado (09:30 - 21:30) Lunes (09:30 - 21:30) Miercoles (09:30 - 21:30) Viernes (09:30 - 21:30) Jueves (09:30 - 21:30) Martes (09:30 - 21:30) Domingo (09:30 - 21:30)

Supported Payment Methods

✓PERFIL DE CARGA ADMITIDO
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
✓COMPATIBLE CON TARJETAS CONTACTLESS
💳RFID Card / Keyfob reader

Accessibility & Amenities

Accessibility: SI. Additional amenities: CENTRO COMERCIAL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.8541767 | Lon: -2.7107935View on OpenStreetMap →

Other Nearby Charging Stations

100 kW(Fast)
140 m away

VI-VITORIA-021

Bremen,10
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
50 kW(Fast)
900 m away

Vitorialanda

Vitorialanda (Estación Edp) 12
Operator:EDP CLIENTES SAU
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.