11 kW• Semi-fast24/7Active in MITECO registry

Fidamc

Av. Rita Levi Montalcini 29, Getafe (28906), Madrid, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity6 bays (6 plugs)
GPS Coordinates40.27484, -3.72906
Official IDODPRGWR0BDBOSWKDL8ZQ
Official Registry DateAug 05, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Getafe, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:16 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:16 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:16 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:16 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:16 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeODPRGWR0BDBOSWKDL8ZQ
Post / EVSE Identifier #1NANCITMCWDSATDBVIFFUW3YCGSS
Post / EVSE Identifier #2ES*WEN*EFIDAMC011
Post / EVSE Identifier #31837ad5e-b5a7-5c04-7bfe-532f7cbc9874
Post / EVSE Identifier #4LIH4JH5UNWSIJOG1UDSS1OCMQOR
Post / EVSE Identifier #5ES*WEN*EFIDAMC021
Post / EVSE Identifier #618656023-bcbf-72b6-7075-a84b945ab6ff
Post / EVSE Identifier #7SHP0YNPBTENST4RDWW9NFTH2CXO
Post / EVSE Identifier #8ES*WEN*EFIDAMC031
Post / EVSE Identifier #99946ec0b-ca32-a65a-8351-a95fb8d3ee69
Post / EVSE Identifier #10SSRJJHBP2GJMRHKMLB5TLBXOVPV
Post / EVSE Identifier #11ES*WEN*EFIDAMC041
Post / EVSE Identifier #12d8cd3c90-785c-8659-a86f-573de154d3e4
Post / EVSE Identifier #13BWTED0KTIBMRLJKOVLUKPIPY1LE
Post / EVSE Identifier #14ES*WEN*EFIDAMC051
Post / EVSE Identifier #1523e702d9-d478-04d5-d59b-9dbe393e7b3d
Post / EVSE Identifier #16QAXJQHOKFETAIBKRMGWYOVNX5FT
Post / EVSE Identifier #17ES*WEN*EFIDAMC061
Post / EVSE Identifier #181bbc19b4-5b39-b10b-c03e-b7afd348d066

Theoretical Charging Times at Maximum Power (11 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~1 h 49 min(~1.8 hours)
40 kWh Battery~3 h 38 min(~3.6 hours)
60 kWh Battery~5 h 27 min(~5.5 hours)
80 kWh Battery~7 h 16 min(~7.3 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.274842 | Lon: -3.729059View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
5.5 km away

M-Leganes-013

Severo Ochoa,15
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
12 points • 12 plugs
Details
22 kW(Semi-fast)
6.3 km away

M-Leganes-009

Maestro,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
6.6 km away

M-Leganes-010

Colon,4
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.