100 kW• Fast⛽Estación BP24/7Active in MITECO registry

Estación bp Puerta Magina

La Lonja,S/N, Mancha Real (23100), Jaén, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (3 plugs)
GPS Coordinates37.78879, -3.61775
Official IDLYSHIM9HAEUMERJMBEFE
Official Registry DateSep 30, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Mancha Real, belonging to the province of Jaén (Andalucía, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
2 connectors available
CHAdeMO
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeLYSHIM9HAEUMERJMBEFE
Post / EVSE Identifier #12ZGJFSVEU5G9PEXE3M59IGEZCTA
Post / EVSE Identifier #2ES*FCT*E230028
Post / EVSE Identifier #3242164
Post / EVSE Identifier #4UA548IBQPZVFJDZZEDKZWAQ4OYR
Post / EVSE Identifier #5ES*FCT*E230029
Post / EVSE Identifier #6242165
Post / EVSE Identifier #7242166

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.788794 | Lon: -3.617753View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
830 m away

E-J-ManchaReal-001

De Ubeda,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)
12.3 km away

20XM32T8KK4AR00002

Energy Carburantes Llanos Del Valle - Pol.
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)🛒Carrefour
13.3 km away

CARREFOUR JAEN

Carretera Bailén-Motril, PK 37.500
Operator:CENTROS COMERCIALES CARREFOUR SA
CCS Combo 2CHAdeMO
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.