30 kW• Semi-fast24/7Active in MITECO registry

E.S. Beroil Aranda de Duero

Av. Portugal 82, Aranda de Duero (09400), Burgos, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates41.66663, -3.72672
Official IDLFQ6YAIROB2RK6QP0VUL
Official Registry DateNov 17, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Aranda de Duero, belonging to the province of Burgos (Castilla y León, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
30 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:75 A
2Charging Bay #2
1 connector available
CCS Combo 2
30 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:75 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeLFQ6YAIROB2RK6QP0VUL
Post / EVSE Identifier #1RZJ8II0XWOMJRYMRV2LX0ZXZGEZ
Post / EVSE Identifier #2ES*WEN*EBEROILADUERO011
Post / EVSE Identifier #3287063ac-5a58-8b04-0eae-a50340513ced
Post / EVSE Identifier #4YI5EJOBUQXZEYLPUZILIDA7JYZI
Post / EVSE Identifier #5ES*WEN*EBEROILADUERO012
Post / EVSE Identifier #6bb53c30c-fe7e-e951-f2a7-c7ab42e14c7a

Theoretical Charging Times at Maximum Power (30 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~40 min(~0.7 hours)
40 kWh Battery~1 h 20 min(~1.3 hours)
60 kWh Battery~2 h(~2 hours)
80 kWh Battery~2 h 40 min(~2.7 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.666629 | Lon: -3.726716View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.7 km away

BU-ArandadeDuero-001

Bemposta (Pg.In. Allendeduero),97
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
120 kW(Fast)
2.5 km away

Aranda de Duero - Prado Sport

Polígono Prado Marina, C. Vendimia, S/N
Operator:(ZUNDER) Grupo Easychargar SA
CCS Combo 2Tipo 2 (Mennekes)
4 points • 4 plugs
Details
50 kW(Fast)⛽Estación Valcarce
2.7 km away

61942049840003

E.S. Valcarce - C/ Vendimia, 2
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.