22 kW• Semi-fastActive in MITECO registry

Elx_Rectorado_1

AVENIDA DE LA UNIVERSIDAD S/N. RECTORADO Y CONSEJO SOCIAL, Elx/Elche (03202), Alicante/Alacant, Spain
Network OperatorUNIVERSIDAD MIGUEL HERNANDEZ DE ELCHE
Total Capacity2 bays (4 plugs)
GPS Coordinates38.27488, -0.68493
Official ID2024007507
Official Registry DateFeb 18, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Elx/Elche, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the UNIVERSIDAD MIGUEL HERNANDEZ DE ELCHE network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CEE Cetac Rojo 32A
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
CEE Cetac Rojo 32A
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
2 connectors available
CEE Cetac Rojo 32A
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
CEE Cetac Rojo 32A
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007507
Post / EVSE Identifier #1COD20240000047668PR00019463
Post / EVSE Identifier #2ES*UMH*E01_E
Post / EVSE Identifier #395604_1
Post / EVSE Identifier #495604_2
Post / EVSE Identifier #5COD20240000047669PR00019464
Post / EVSE Identifier #6ES*UMH*E02_E
Post / EVSE Identifier #7145333_1
Post / EVSE Identifier #8145333_2

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
✓PERFIL DE CARGA ADMITIDO

Accessibility & Amenities

Accessibility: SI. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.274884 | Lon: -0.684929View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
7.8 km away

E-A-Elche/Elx-018

A-70,25
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.