22 kW• Semi-fastHorario habitualActive in MITECO registry

E-VA-MedinaDelCampo-001

Autovia Del Noroeste A-6 (N-Vi),157, Medina del Campo (47400), Valladolid, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates41.31145, -4.89651
Official ID2024001056
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Medina del Campo, belonging to the province of Valladolid (Castilla y León, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001056
Post / EVSE Identifier #1COD20240000023193PR00003136
Post / EVSE Identifier #2ES*IBD*E156258
Post / EVSE Identifier #3165727
Post / EVSE Identifier #4COD20240000023194PR00003137
Post / EVSE Identifier #5ES*IBD*E156259
Post / EVSE Identifier #6165728

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (09:00 - 19:00) Jueves (09:00 - 19:00) Viernes (09:00 - 19:00) Miercoles (09:00 - 19:00) Lunes (09:00 - 19:00) Sabado (10:00 - 18:00) Domingo (10:00 - 18:00)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.311452 | Lon: -4.896514View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)🏨Hotel / Alojamiento
1.5 km away

Hotel Villa de Ferias

Av. Del V Centenario De Isabel La Católica 5
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)CCS Combo 2
1 point • 3 plugs
Details
50 kW(Fast)⛽Estación Repsol
1.5 km away

Repsol ES, CRED Medina del campo

Av Del Quinto Centenario, 2
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
50 kW(Fast)⛽Estación Repsol
1.8 km away

Repsol ES, Es Codisoil Medina

C/ Avenida De La Constitucion, 48
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.