22 kW• Semi-fastHorario habitualActive in MITECO registry

E-TF-LosLlanosDeAridane-001

Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates28.49017, -16.36938
Official ID2024006657
Official Registry DateNov 08, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of San Cristóbal de La Laguna, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006657
Post / EVSE Identifier #1COD20240000045237PR00017232
Post / EVSE Identifier #2ES*IBD*E232369
Post / EVSE Identifier #3244571
Post / EVSE Identifier #4COD20240000045238PR00017233
Post / EVSE Identifier #5ES*IBD*E232370
Post / EVSE Identifier #6244572
Post / EVSE Identifier #7COD20240000045239PR00017234
Post / EVSE Identifier #8ES*IBD*E232371
Post / EVSE Identifier #9244573
Post / EVSE Identifier #10COD20240000045240PR00017235
Post / EVSE Identifier #11ES*IBD*E232372
Post / EVSE Identifier #12244574
Post / EVSE Identifier #13COD20240000045241PR00017236
Post / EVSE Identifier #14ES*IBD*E232373
Post / EVSE Identifier #15244575
Post / EVSE Identifier #16COD20240000045242PR00017237
Post / EVSE Identifier #17ES*IBD*E232374
Post / EVSE Identifier #18244576

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Viernes (09:00 - 21:30) Miercoles (09:00 - 21:30) Sabado (00:00 - 00:00) Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.490169 | Lon: -16.369376View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
2.9 km away

DISA TACORONTE

Carretera General Del Norte Tf, Pk 152
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
3 points • 3 plugs
Details
22 kW(Semi-fast)
6.8 km away

E-TF-LaLaguna-004

Pico Cho Canino,8
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.