7.4 kW• Semi-fast24/7Active in MITECO registry

E-SS-ArrasateMondragon-003

Gesalibar Auzoa,15, Arrasate/Mondragón (20500), Gipuzkoa, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates43.06546, -2.52862
Official ID2024000291
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Arrasate/Mondragón, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000291
Post / EVSE Identifier #1COD20240000018107PR00000822
Post / EVSE Identifier #2ES*IBD*E10416
Post / EVSE Identifier #311016
Post / EVSE Identifier #4COD20240000018108PR00000823
Post / EVSE Identifier #5ES*IBD*E10417
Post / EVSE Identifier #611017
Post / EVSE Identifier #7COD20240000018109PR00000824
Post / EVSE Identifier #8ES*IBD*E10432
Post / EVSE Identifier #911032
Post / EVSE Identifier #10COD20240000018110PR00000825
Post / EVSE Identifier #11ES*IBD*E10433
Post / EVSE Identifier #1211033
Post / EVSE Identifier #13COD20240000018105PR00000820
Post / EVSE Identifier #14ES*IBD*E5129
Post / EVSE Identifier #155317
Post / EVSE Identifier #16COD20240000018106PR00000821
Post / EVSE Identifier #17ES*IBD*E5130
Post / EVSE Identifier #185318

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.06546 | Lon: -2.52862View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
3.1 km away

APK2 Laubide

Maalako Errabala Aldea 33
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
3.3 km away

APK2 Biteri

Biteri Plaza 3
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
10.6 km away

SS-Bergara-001

Leizeaga Kalea,7
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.