22 kW• Semi-fastHorario habitualActive in MITECO registry

E-PO-Tui-001

Anta,S/N, Tui (36700), Pontevedra, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates42.03749, -8.66152
Official ID2025000398
Official Registry DateMar 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tui, belonging to the province of Pontevedra (Galicia, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000398
Post / EVSE Identifier #1COD20250000049945PR00001560
Post / EVSE Identifier #2ES*IBD*E227395
Post / EVSE Identifier #3239388
Post / EVSE Identifier #4COD20250000049946PR00001561
Post / EVSE Identifier #5ES*IBD*E227396
Post / EVSE Identifier #6239389
Post / EVSE Identifier #7COD20250000049947PR00001562
Post / EVSE Identifier #8ES*IBD*E227397
Post / EVSE Identifier #9239390
Post / EVSE Identifier #10COD20250000049948PR00001563
Post / EVSE Identifier #11ES*IBD*E227398
Post / EVSE Identifier #12239391
Post / EVSE Identifier #13COD20250000049949PR00001564
Post / EVSE Identifier #14ES*IBD*E227399
Post / EVSE Identifier #15239392
Post / EVSE Identifier #16COD20250000049950PR00001565
Post / EVSE Identifier #17ES*IBD*E227400
Post / EVSE Identifier #18239393

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.037487 | Lon: -8.661517View on OpenStreetMap →

Other Nearby Charging Stations

180 kW(Ultra-fast)
14.0 km away

ELECTRA ALTO MIÑO

Polígono Industrial Chan da Ponte
Operator:ENERGEA CONSULTING Y ASESORES SL
Tipo 2 (Mennekes)CCS Combo 1CCS Combo 2
2 points • 4 plugs
Details
7 kW(Standard)
14.3 km away

SYNGENTA

Lugar a Relva
Operator:ENERGEA CONSULTING Y ASESORES SL
Tipo 2 (Mennekes)
2 points • 4 plugs
Details
350 kW(Ultra-fast)
14.9 km away

PO-Mos-001

Sanquiñeda Monte,118
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.