22 kW• Semi-fastHorario habitualActive in MITECO registry

E-NA-Barañain-001

Eulza/Eultzako Etorbidea,1, Pamplona/Iruña (31010), Navarra, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates42.80145, -1.68647
Official IDEBJPUVSVCZQHKR22SJIG
Official Registry DateApr 04, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Pamplona/Iruña, belonging to the province of Navarra (Navarra, Comunidad Foral de, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeEBJPUVSVCZQHKR22SJIG
Post / EVSE Identifier #1263MWTZCEK1MUDARTL9SBDP82QX
Post / EVSE Identifier #2ES*IBD*E263636
Post / EVSE Identifier #3276826
Post / EVSE Identifier #4UANHHBO0X1GBOSWJUMQ5NCJG6HO
Post / EVSE Identifier #5ES*IBD*E263637
Post / EVSE Identifier #6276827
Post / EVSE Identifier #76O6ZXZIGJ6X3TRERRIYU6F0C0KB
Post / EVSE Identifier #8ES*IBD*E263638
Post / EVSE Identifier #9276828
Post / EVSE Identifier #105E9HZOOXIFUI8R0TUWTSRDQCBTT
Post / EVSE Identifier #11ES*IBD*E263639
Post / EVSE Identifier #12276829
Post / EVSE Identifier #13F3OXUFURXVLQSXM5JX4VPANY9BJ
Post / EVSE Identifier #14ES*IBD*E263640
Post / EVSE Identifier #15276830
Post / EVSE Identifier #16USZKMEBAY1TZARQRUBRZQM4Q6HY
Post / EVSE Identifier #17ES*IBD*E263641
Post / EVSE Identifier #18276831

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 42.801445 | Lon: -1.686475View on OpenStreetMap →

Other Nearby Charging Stations

180 kW(Ultra-fast)
990 m away

NA-Zizurmayor-001

Estella,9
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2
4 points • 4 plugs
Details
50 kW(Fast)
1.8 km away

NA-Zizurmayor-002

Ikortebidea,0
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
4 points • 5 plugs
Details
7 kW(Standard)
1.8 km away

NA-Cizur-001

Esparza Bidea,0
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.