22 kW• Semi-fastHorario habitualActive in MITECO registry

E-GU-Guadalajara-004

Trafalgar,4, Guadalajara (19004), Guadalajara, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates40.62862, -3.18590
Official ID2025000013
Official Registry DateDec 27, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Guadalajara, belonging to the province of Guadalajara (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000013
Post / EVSE Identifier #1COD20250000047735PR00000059
Post / EVSE Identifier #2ES*IBD*E222273
Post / EVSE Identifier #3234273
Post / EVSE Identifier #4COD20250000047736PR00000060
Post / EVSE Identifier #5ES*IBD*E222274
Post / EVSE Identifier #6234274
Post / EVSE Identifier #7COD20250000047737PR00000061
Post / EVSE Identifier #8ES*IBD*E222275
Post / EVSE Identifier #9234275
Post / EVSE Identifier #10COD20250000047738PR00000062
Post / EVSE Identifier #11ES*IBD*E222276
Post / EVSE Identifier #12234276
Post / EVSE Identifier #13COD20250000047739PR00000063
Post / EVSE Identifier #14ES*IBD*E222277
Post / EVSE Identifier #15234277
Post / EVSE Identifier #16COD20250000047740PR00000064
Post / EVSE Identifier #17ES*IBD*E222278
Post / EVSE Identifier #18234278

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Sabado (00:00 - 00:00) Martes (09:00 - 21:30) Lunes (09:00 - 21:30) Miercoles (09:00 - 21:30) Jueves (09:00 - 21:30) Viernes (09:00 - 21:30) Domingo (00:00 - 00:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.628618 | Lon: -3.185901View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
1.0 km away

AhorraMas Aritio

C. De Francisco Aritio 105
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
180 kW(Ultra-fast)
3.1 km away

GU-Guadalajara-008

Teresa Claramunt,2
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.