22 kW• Semi-fastHorario habitualActive in MITECO registry

E-GR-LaZubia-001

Gandhi,6, Zubia, La (18140), Granada, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates37.12956, -3.58354
Official ID2024006668
Official Registry DateNov 08, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Zubia, La, belonging to the province of Granada (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006668
Post / EVSE Identifier #1COD20240000045281PR00017276
Post / EVSE Identifier #2ES*IBD*E222847
Post / EVSE Identifier #3234814
Post / EVSE Identifier #4COD20240000045282PR00017277
Post / EVSE Identifier #5ES*IBD*E222848
Post / EVSE Identifier #6234815
Post / EVSE Identifier #7COD20240000045283PR00017278
Post / EVSE Identifier #8ES*IBD*E222851
Post / EVSE Identifier #9234818
Post / EVSE Identifier #10COD20240000045284PR00017279
Post / EVSE Identifier #11ES*IBD*E222852
Post / EVSE Identifier #12234819
Post / EVSE Identifier #13COD20240000045285PR00017280
Post / EVSE Identifier #14ES*IBD*E222853
Post / EVSE Identifier #15234820
Post / EVSE Identifier #16COD20240000045286PR00017281
Post / EVSE Identifier #17ES*IBD*E222854
Post / EVSE Identifier #18234821

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Sabado (00:00 - 00:00) Domingo (00:00 - 00:00) Viernes (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.129556 | Lon: -3.58354View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
4.3 km away

APK2 Escolapios

Calle Sos Del Rey Católico 11
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)
4.3 km away

US_218_Armilla

Avda. Cristóbal Colón
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
7.4 kW(Semi-fast)
4.6 km away

APK2 Arabial

Calle Arabial S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.