22 kW• Semi-fastHorario habitualActive in MITECO registry

E-GC-Arucas-001

Doramas,13, Arucas (35411), Palmas, Las, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates28.10928, -15.51048
Official ID2024001885
Official Registry DateApr 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Arucas, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024001885
Post / EVSE Identifier #1COD20240000024655PR00004699
Post / EVSE Identifier #2ES*IBD*E227702
Post / EVSE Identifier #3239622
Post / EVSE Identifier #4COD20240000024656PR00004700
Post / EVSE Identifier #5ES*IBD*E227703
Post / EVSE Identifier #6239623
Post / EVSE Identifier #7COD20240000024657PR00004701
Post / EVSE Identifier #8ES*IBD*E227704
Post / EVSE Identifier #9239624
Post / EVSE Identifier #10COD20240000024658PR00004702
Post / EVSE Identifier #11ES*IBD*E227705
Post / EVSE Identifier #12239625

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30) Lunes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.109275 | Lon: -15.510482View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
3.3 km away

US_312_Las_Palmas

Barrio De Tamaraceite
Operator:PLENOIL CANARIAS, S.L.U.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
60 kW(Fast)
6.4 km away

DISA TEROR

Cl Parroco Juan Gonzalez, 1
Operator:Prio Recharge Sl.
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.