22 kW• Semi-fastHorario habitualActive in MITECO registry

E-CU-Colliga-001

Hermanos Becerril,25, Cuenca (16004), Cuenca, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates40.06184, -2.13167
Official IDYHZN96P12XGUNIOYJCZT
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cuenca, belonging to the province of Cuenca (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeYHZN96P12XGUNIOYJCZT
Post / EVSE Identifier #1EVCTU1FSDKR6JKC1JSDWRTUYTHS
Post / EVSE Identifier #2ES*IBD*E398786
Post / EVSE Identifier #3312143
Post / EVSE Identifier #4O9EOUWSAY1RCOYLLUDI9PKCTSKL
Post / EVSE Identifier #5ES*IBD*E398787
Post / EVSE Identifier #6312144
Post / EVSE Identifier #7ZDOZCFSYRJGGM5SULR1XQAVD0LF
Post / EVSE Identifier #8ES*IBD*E398784
Post / EVSE Identifier #9312141
Post / EVSE Identifier #10DO2739MHOL5DSXFECHDYCUVINWV
Post / EVSE Identifier #11ES*IBD*E398785
Post / EVSE Identifier #12312142
Post / EVSE Identifier #13MB2CTUVRW5WNAGVKPL4HHPWUXUS
Post / EVSE Identifier #14ES*IBD*E398788
Post / EVSE Identifier #15312145
Post / EVSE Identifier #16VGKNNR6A1LWNSR5RRIPTDPXVJUH
Post / EVSE Identifier #17ES*IBD*E398789
Post / EVSE Identifier #18312146

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30) Lunes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.061837 | Lon: -2.13167View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
520 m away

Repsol ES, Petrodea S.L.

Cl Hermanos Becerril, 2
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
22 kW(Semi-fast)
550 m away

AhorraMAS Cuenca

Paseo De San Antonio 42
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.