22 kW• Semi-fastHorario habitualActive in MITECO registry

E-CO-PuenteGenil-001

Montalban,S/N, Córdoba (14500), Córdoba, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates37.39660, -4.76610
Official ID2025000027
Official Registry DateDec 27, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Córdoba, belonging to the province of Córdoba (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2025000027
Post / EVSE Identifier #1COD20250000047797PR00000121
Post / EVSE Identifier #2ES*IBD*E222950
Post / EVSE Identifier #3234938
Post / EVSE Identifier #4COD20250000047798PR00000122
Post / EVSE Identifier #5ES*IBD*E222951
Post / EVSE Identifier #6234939
Post / EVSE Identifier #7COD20250000047799PR00000123
Post / EVSE Identifier #8ES*IBD*E222952
Post / EVSE Identifier #9234940
Post / EVSE Identifier #10COD20250000047800PR00000124
Post / EVSE Identifier #11ES*IBD*E222953
Post / EVSE Identifier #12234941
Post / EVSE Identifier #13COD20250000047801PR00000125
Post / EVSE Identifier #14ES*IBD*E222954
Post / EVSE Identifier #15234942
Post / EVSE Identifier #16COD20250000047802PR00000126
Post / EVSE Identifier #17ES*IBD*E222955
Post / EVSE Identifier #18234943

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Miercoles (09:00 - 21:30) Sabado (00:00 - 00:00) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30) Martes (09:00 - 21:30) Domingo (00:00 - 00:00)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.396599 | Lon: -4.766096View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
130 m away

CO-PuenteGenil-001

Montalban,39
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
150 kW(Ultra-fast)
140 m away

HYC15021BZ1163A

Mcdonalds - C. Montalbán, 19, 14500 Puente
Operator:ENDESA X WAY, S.L.
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.