22 kW• Semi-fastHorario habitualActive in MITECO registry

E-B-Cardedeu-001

Dosrius,206, Cànoves i Samalús (08440), Barcelona, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates41.62968, 2.36223
Official ID2024002360
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cànoves i Samalús, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002360
Post / EVSE Identifier #1COD20240000026380PR00006031
Post / EVSE Identifier #2ES*IBD*E232569
Post / EVSE Identifier #3244770
Post / EVSE Identifier #4COD20240000026381PR00006032
Post / EVSE Identifier #5ES*IBD*E232570
Post / EVSE Identifier #6244771
Post / EVSE Identifier #7COD20240000026382PR00006033
Post / EVSE Identifier #8ES*IBD*E232571
Post / EVSE Identifier #9244772
Post / EVSE Identifier #10COD20240000026383PR00006034
Post / EVSE Identifier #11ES*IBD*E232572
Post / EVSE Identifier #12244773
Post / EVSE Identifier #13COD20240000026384PR00006035
Post / EVSE Identifier #14ES*IBD*E232573
Post / EVSE Identifier #15244774
Post / EVSE Identifier #16COD20240000026385PR00006036
Post / EVSE Identifier #17ES*IBD*E232574
Post / EVSE Identifier #18244775

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Miercoles (09:00 - 21:30) Jueves (09:00 - 21:30) Martes (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.629678 | Lon: 2.36223View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
9.8 km away

Gasuir La Garriga

C-17
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 5 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.