22 kW• Semi-fastHorario habitualActive in MITECO registry

E-AB-Albacete-007

Constantino Romero,0, Albacete (02006), Albacete, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity6 bays (6 plugs)
GPS Coordinates39.00572, -1.88510
Official ID2024004989
Official Registry DateSep 23, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Albacete, belonging to the province of Albacete (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004989
Post / EVSE Identifier #1COD20240000040846PR00013020
Post / EVSE Identifier #2ES*IBD*E222055
Post / EVSE Identifier #3234055
Post / EVSE Identifier #4COD20240000040847PR00013021
Post / EVSE Identifier #5ES*IBD*E222056
Post / EVSE Identifier #6234056
Post / EVSE Identifier #7COD20240000040848PR00013022
Post / EVSE Identifier #8ES*IBD*E222057
Post / EVSE Identifier #9234057
Post / EVSE Identifier #10COD20240000040849PR00013023
Post / EVSE Identifier #11ES*IBD*E222058
Post / EVSE Identifier #12234058
Post / EVSE Identifier #13COD20240000040850PR00013024
Post / EVSE Identifier #14ES*IBD*E222059
Post / EVSE Identifier #15234059
Post / EVSE Identifier #16COD20240000040851PR00013025
Post / EVSE Identifier #17ES*IBD*E222060
Post / EVSE Identifier #18234060

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (09:00 - 21:30) Miercoles (09:00 - 21:30) Martes (09:00 - 21:30) Domingo (00:00 - 00:00) Sabado (00:00 - 00:00) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.005715 | Lon: -1.885102View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
50 m away

US_272_Albacete_II

Calle De Constantino Romero
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.