7.3 kW• Standard24/7Active in MITECO registry

E-41-Sevilla-010

Genil,N/A, Sevilla (41001), Sevilla, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (4 plugs)
GPS Coordinates37.38741, -6.00056
Official ID2024002057
Official Registry DateMar 22, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sevilla, belonging to the province of Sevilla (Andalucía, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Schuko (Enchufe doméstico)
2.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:10 A
Tipo 2 (Mennekes)
7.3 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024002057
Post / EVSE Identifier #1COD20240000025537PR00005188
Post / EVSE Identifier #2ES*IBD*E4244
Post / EVSE Identifier #34405
Post / EVSE Identifier #44406
Post / EVSE Identifier #5COD20240000025538PR00005189
Post / EVSE Identifier #6ES*IBD*E4264
Post / EVSE Identifier #74425
Post / EVSE Identifier #84426

Theoretical Charging Times at Maximum Power (7.3 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 44 min(~2.7 hours)
40 kWh Battery~5 h 29 min(~5.5 hours)
60 kWh Battery~8 h 13 min(~8.2 hours)
80 kWh Battery~10 h 58 min(~11 hours)

Opening Hours

Miercoles (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 37.387405 | Lon: -6.000556View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
450 m away

APK2 Magdalena

San Pablo 1
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7.4 kW(Semi-fast)
580 m away

APK2 Arjona

Arjona S/N
Operator:EDP CLIENTES SAU
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.