50 kW• Fast24/7Active in MITECO registry

DIPBA Navalvillar de Pela

De Las Rañas, S/N, Navalvillar de Pela (06760), Badajoz, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity3 bays (3 plugs)
GPS Coordinates39.10372, -5.46636
Official ID2024003980
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Navalvillar de Pela, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003980
Post / EVSE Identifier #1COD20240000033531PR00009723
Post / EVSE Identifier #2ES*WEN*EDBJZNAVALVILLAR13
Post / EVSE Identifier #328347a85-47ae-7b65-2563-c0bc7ab981aa
Post / EVSE Identifier #4COD20240000033532PR00009724
Post / EVSE Identifier #5ES*WEN*EDBJZNAVALVILLAR12
Post / EVSE Identifier #64626e21a-8549-9a3f-7d52-fb1675f5e0c8
Post / EVSE Identifier #7COD20240000033533PR00009725
Post / EVSE Identifier #8ES*WEN*EDBJZNAVALVILLAR11
Post / EVSE Identifier #900968380-b38e-6b59-5ee6-9f077e4c37ba

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.103716 | Lon: -5.466362View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)⛽Estación Repsol
15.0 km away

Repsol, DC - Madrigalejo

C/ Hispanidad (Barrio Sanjuan)
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.