22 kW• Semi-fast24/7Active in MITECO registry

DIPBA Fregenal de la Sierra

Barriada Caja Rural, S/N, Fregenal de la Sierra (06340), Badajoz, Spain
Network OperatorWENEA EMOBILITY SERVICES S.L.
Total Capacity2 bays (8 plugs)
GPS Coordinates38.16475, -6.65410
Official ID2024003978
Official Registry DateJun 12, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Fregenal de la Sierra, belonging to the province of Badajoz (Extremadura, Spain). The charging equipment and commercial operation belong to the WENEA EMOBILITY SERVICES S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
4 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
4 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003978
Post / EVSE Identifier #1COD20240000033527PR00009719
Post / EVSE Identifier #2ES*WEN*EDBJZFREGENAL12
Post / EVSE Identifier #38bdff9af-d279-4a9f-6e06-84977eb91aff
Post / EVSE Identifier #4COD20240000033528PR00009720
Post / EVSE Identifier #5ES*WEN*EDBJZFREGENAL11
Post / EVSE Identifier #61a809117-2ea7-b05d-eead-edbbb8695a9d

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) (00:00 - 23:59) Martes (00:00 - 23:59) (00:00 - 23:59) Lunes (00:00 - 23:59) (00:00 - 23:59) Jueves (00:00 - 23:59) (00:00 - 23:59) Sabado (00:00 - 23:59) (00:00 - 23:59) Viernes (00:00 - 23:59) (00:00 - 23:59) Domingo (00:00 - 23:59) (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.164752 | Lon: -6.654096View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
4.8 km away

22XP22T3KK4AK00043

Pol. Ind. Chácara, 06350, Badajoz, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
4.8 km away

22XP22T3KK4AK00059

Pol. Ind. Chácara, 06350, Badajoz, Spain
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
21 kW(Semi-fast)
4.8 km away

22XP22T3KK4AK00009

Pol. Ind. Chácara, 15, 06350 Higuera La
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.