22 kW• Semi-fast24/7Active in MITECO registry

DFG - Arama

Diseminado, Arama Plaza, 10, 20248 Aram, Arama (20248), Gipuzkoa, Spain
Network OperatorDiputación Foral de Gipuzkoa
Total Capacity2 bays (2 plugs)
GPS Coordinates43.06336, -2.16636
Official ID2024004639
Official Registry DateJul 18, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Arama, belonging to the province of Gipuzkoa (País Vasco, Spain). The charging equipment and commercial operation belong to the Diputación Foral de Gipuzkoa network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004639
Post / EVSE Identifier #1COD20240000036894PR00012027
Post / EVSE Identifier #2ES*200*EINDFG000027ER1
Post / EVSE Identifier #3216914
Post / EVSE Identifier #4COD20240000036895PR00012028
Post / EVSE Identifier #5ES*200*EINDFG000027ER2
Post / EVSE Identifier #6216915

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Lunes (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.063355 | Lon: -2.166364View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
450 m away

DFG - Itsasondo Plaza

Kalea Nagusia 1
Operator:Diputación Foral de Gipuzkoa
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
3.3 km away

GERNIKA PASEALEKUA

Gernika pasealekua
Operator:BEASAINGO UDALA
CHAdeMOCCS Combo 2
2 points • 2 plugs
Details
22 kW(Semi-fast)
7.8 km away

DFG - Ormaiztegi

7 Gabirialde Kalea
Operator:Diputación Foral de Gipuzkoa
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.