300 kW• Ultra-fast24/7Active in MITECO registry

Cornellà de Llobregat - Ayafuel Ferrocarrils Catalans

Passeig Dels Ferrocarrils Catalans, 240, 2..., Cornellà de Llobregat (08940), Barcelona, Spain
Network OperatorCHARG-ELECTRA SPAIN SL
Total Capacity4 bays (4 plugs)
GPS Coordinates41.35383, 2.09276
Official IDA7ZR32MDFAASX3FCMZ8F
Official Registry DateFeb 23, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Cornellà de Llobregat, belonging to the province of Barcelona (Cataluña, Spain). The charging equipment and commercial operation belong to the CHARG-ELECTRA SPAIN SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A
4Charging Bay #4
1 connector available
CCS Combo 2
⚡ 800V300 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeA7ZR32MDFAASX3FCMZ8F
Post / EVSE Identifier #1HKYZ38YWS0HRLOGNCZLVBDUO7BT
Post / EVSE Identifier #2ES*ELC*EWFW9
Post / EVSE Identifier #3combo-ccs-eu_1
Post / EVSE Identifier #4FWZVKLOGUR4OAPCUOFHZZBEHJFG
Post / EVSE Identifier #5ES*ELC*EHSYK
Post / EVSE Identifier #6combo-ccs-eu_2
Post / EVSE Identifier #7Z2SL3QPVSE2GYZNKSMEKD3NISEI
Post / EVSE Identifier #8ES*ELC*EWPT3
Post / EVSE Identifier #9JYEPTIY7OU1AAMIGEEIOGGKIRV4
Post / EVSE Identifier #10ES*ELC*EWUAP

Theoretical Charging Times at Maximum Power (300 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~4 min(~0.1 hours)
40 kWh Battery~8 min(~0.1 hours)
60 kWh Battery~12 min(~0.2 hours)
80 kWh Battery~16 min(~0.3 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.353825 | Lon: 2.092759View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.