22 kW• Semi-fastHorario habitualActive in MITECO registry

Coolab Coworking

Calle Impresores, 20, Boadilla del Monte (28660), Madrid, Spain
Network OperatorWenea Services Spain, S.L.
Total Capacity2 bays (2 plugs)
GPS Coordinates40.39570, -3.84431
Official ID2024003967
Official Registry DateApr 01, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Boadilla del Monte, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the Wenea Services Spain, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003967
Post / EVSE Identifier #1COD20240000033474PR00009666
Post / EVSE Identifier #2ES*WEN*EURBINA2
Post / EVSE Identifier #3e7f2098f-ef25-48a8-5621-6df555b25038
Post / EVSE Identifier #4COD20240000033475PR00009667
Post / EVSE Identifier #5ES*WEN*EURBINA1
Post / EVSE Identifier #67a4a5aa6-afd3-d8b6-8faf-0554a12ba35a

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

Miercoles (09:00 - 20:00) Lunes (09:00 - 20:00) Viernes (09:00 - 19:00) Martes (09:00 - 20:00) Jueves (09:00 - 20:00)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.395705 | Lon: -3.844307View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
6.2 km away

M-MADRID-011

Sinfonia,9
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
50 kW(Fast)
6.2 km away

M-Madrid-042

Aviacion,20
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMO
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.