120 kW• Fast🛒Supermercado ConsumHorario habitualActive in MITECO registry

CONSUM OLLERIA

AVENIDA DE LA DIPUTACION PROVINCIAL,32, Olleria, l' (46850), Valencia/València, Spain
Network OperatorREMO SUSTAINABLE MOBILITY S.L
Total Capacity1 bay (3 plugs)
GPS Coordinates38.91329, -0.55323
Official ID2024007488
Official Registry DateDec 17, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Olleria, l', belonging to the province of Valencia/València (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REMO SUSTAINABLE MOBILITY S.L network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:200 A
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:200 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024007488
Post / EVSE Identifier #1COD20240000047528PR00019326
Post / EVSE Identifier #2ES*RSM*E000000000074
Post / EVSE Identifier #31095
Post / EVSE Identifier #41096
Post / EVSE Identifier #51097

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Domingo (00:00 - 00:00) Viernes (09:00 - 21:30) Sabado (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

✓PREFERENCIAS DE CARGA ADMITIDAS
✓COMPATIBLE CON TARJETAS CONTACTLESS
📱Mobile App (Remote activation & eMSP roaming)
🔓Remote plug unlock supported

Accessibility & Amenities

Accessibility: SI. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.913286 | Lon: -0.5532312View on OpenStreetMap →

Other Nearby Charging Stations

120 kW(Fast)🛒Supermercado Consum
6.3 km away

CONSUM CANALS

Calle del Maestro Serrano,19
Operator:REMO SUSTAINABLE MOBILITY S.L
CCS Combo 2Tipo 2 (Mennekes)
1 point • 2 plugs
Details
22 kW(Semi-fast)
9.3 km away

V-XATIVA-005

Sequia La Vila,22
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
3.7 kW(Standard)
9.4 km away

INEL, SL

Avenida del Textil,67
Operator:FENIE ENERGIA, SA
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.