50 kW• Fast🛒Supermercado ConsumHorario habitualActive in MITECO registry

CONSUM BANYERES DE MARIOLA

Carrer Villena, 41, Banyeres de Mariola (03450), Alicante/Alacant, Spain
Network OperatorREMO SUSTAINABLE MOBILITY S.L
Total Capacity1 bay (3 plugs)
GPS Coordinates38.71929, -0.66076
Official IDZJHP6UW0NVZ2TGHSDKRB
Official Registry DateJul 07, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Banyeres de Mariola, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REMO SUSTAINABLE MOBILITY S.L network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:150 A
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:150 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeZJHP6UW0NVZ2TGHSDKRB
Post / EVSE Identifier #1K73NPXDMSVWXUNRTEHRJMXGCSLP
Post / EVSE Identifier #2ES*RSM*E000000000091
Post / EVSE Identifier #31138
Post / EVSE Identifier #41137
Post / EVSE Identifier #51139

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Sabado (09:00 - 21:30) Martes (09:00 - 21:30) Jueves (09:00 - 21:30) Viernes (09:00 - 21:30)

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CONTACTLESS
📱Mobile App (Remote activation & eMSP roaming)
🔓Remote plug unlock supported

Accessibility & Amenities

Accessibility: SI. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.7192906 | Lon: -0.6607552View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
12.7 km away

PUNTO DE RECARGA LALFORI

CARRETERA BENEIXAMA, 1 FONTANARS DELS ALFORINS, Valencia
Operator:FENIE ENERGIA, SA
Tipo 2 (Mennekes)Schuko (Enchufe doméstico)
1 point • 2 plugs
Details
30 kW(Semi-fast)🏬Centro Comercial
12.7 km away

C.C. El Teler

Carrer Del Pintor Josep Segrelles, 1
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
3 points • 3 plugs
Details
120 kW(Fast)🛒Supermercado Consum
13.8 km away

SM Consum 494 - Castalla

Av. De Onil, 58, 03420 Castalla, Alicante
Operator:ERANOVUM E-MOBILITY, S.L.
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.