60 kW• Fast24/7Active in MITECO registry

Club Náutico de Jávea

5 Puerto De Javea, Xàbia/Jávea (03730), Alicante/Alacant, Spain
Network OperatorERANOVUM E-MOBILITY, S.L.
Total Capacity1 bay (1 plug)
GPS Coordinates38.79877, 0.18675
Official ID2023002770
Official Registry DateSep 18, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Xàbia/Jávea, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the ERANOVUM E-MOBILITY, S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
60 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:200 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002770
Post / EVSE Identifier #1COD20230000012215PR00001618
Post / EVSE Identifier #2ES*ERA*E25010
Post / EVSE Identifier #31

Theoretical Charging Times at Maximum Power (60 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~20 min(~0.3 hours)
40 kWh Battery~40 min(~0.7 hours)
60 kWh Battery~1 h(~1 hours)
80 kWh Battery~1 h 20 min(~1.3 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.7987684 | Lon: 0.1867511View on OpenStreetMap →

Other Nearby Charging Stations

30 kW(Semi-fast)
7.2 km away

Marina de Denia

Puerto Deportivo
Operator:ERANOVUM E-MOBILITY, S.L.
Tipo 2 (Mennekes)CCS Combo 2
3 points • 5 plugs
Details
22 kW(Semi-fast)
8.7 km away

EATIM JESUS POBRE

C/ Diagonal S/N JESÚS POBRE, Alicante
Operator:FENIE ENERGIA, SA
Tipo 2 (Mennekes)
1 point • 2 plugs
Details
100 kW(Fast)
10.0 km away

CC Alaire

Urbanizacion Poble, 3P, 03726 Alcasar, Alican
Operator:Punto Recargas SL
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.