50 kW• Fast24/7Active in MITECO registry

Club de Padel La Moraleja - Alcobendas

Av. De Bruselas, 29, 28108 Alcobendas, Madrid, Alcobendas (28108), Madrid, Spain
Network OperatorPunto Recargas SL
Total Capacity18 bays (18 plugs)
GPS Coordinates40.52914, -3.64027
Official IDP22VEFZ4ZRBFTANYGHQ6
Official Registry DateSep 03, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcobendas, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
7Charging Bay #7
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
8Charging Bay #8
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
9Charging Bay #9
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
10Charging Bay #10
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
11Charging Bay #11
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
12Charging Bay #12
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
13Charging Bay #13
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
14Charging Bay #14
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
15Charging Bay #15
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
16Charging Bay #16
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
17Charging Bay #17
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
18Charging Bay #18
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeP22VEFZ4ZRBFTANYGHQ6
Post / EVSE Identifier #1XNG3NE6CSYT67KBWL0I8US83YVR
Post / EVSE Identifier #2ES*PWH*EPADALCALF03861
Post / EVSE Identifier #31
Post / EVSE Identifier #4NEUVHSSEAU7BN2KNGMVUMWNUSR9
Post / EVSE Identifier #5ES*PWH*EPADALCALF03871
Post / EVSE Identifier #6EHXDQWVSL4YCZPVPEGCSWNKM5TI
Post / EVSE Identifier #7ES*PWH*EPADALCALF03881
Post / EVSE Identifier #8OLNJNF0TLBOEZJSZLF3P1OJ5N6M
Post / EVSE Identifier #9ES*PWH*EPADALCALF03891
Post / EVSE Identifier #10MTWV1DP8SDY1IOOI0Z9NKQYQT3X
Post / EVSE Identifier #11ES*PWH*EPADALCALF03901
Post / EVSE Identifier #12KGKGKJL45RKDA9RUJCOAYWLRMEM
Post / EVSE Identifier #13ES*PWH*EPADALCALF03911
Post / EVSE Identifier #14NICQ0ZPCZB6R16PGTKQAQYCTAWH
Post / EVSE Identifier #15ES*PWH*EPADALCALF03921
Post / EVSE Identifier #164VAN0ZMBSUAO9QL0EMEGX0ARGPK
Post / EVSE Identifier #17ES*PWH*EPADALCALF03931
Post / EVSE Identifier #18JRRCRNMVXYGDLGDD4XQTSVU8FLU
Post / EVSE Identifier #19ES*PWH*EPADALCALF03941
Post / EVSE Identifier #20OG1DQADGFX49AGXJUCUR1CLOR2U
Post / EVSE Identifier #21ES*PWH*EPADALCALF03951
Post / EVSE Identifier #22D7URPVU5PVIKJMM5NQONG142BIP
Post / EVSE Identifier #23ES*PWH*EPADALCALF03961
Post / EVSE Identifier #248JTJX4QQOZBOT4N83KTHXHMYLJJ
Post / EVSE Identifier #25ES*PWH*EPADALCALF03971
Post / EVSE Identifier #26MZZXMNXTMZJPPHPASHDXHVMLADI
Post / EVSE Identifier #27ES*PWH*EPADALCALF03981
Post / EVSE Identifier #28PI1DZ8JYVLDX9ZCQ708GEYP0ZKT
Post / EVSE Identifier #29ES*PWH*EPADALCALF03991
Post / EVSE Identifier #30VZXU3R1UYERFRRXZ2CKFMCFGQJA
Post / EVSE Identifier #31ES*PWH*EPADALCALF04001
Post / EVSE Identifier #32OUJUJO9QHG1OBFTZNH4G8UVOT7K
Post / EVSE Identifier #33ES*PWH*EPADALCKEM00991
Post / EVSE Identifier #34ERCMXTPVDI93NGVHOKWT5QATKYJ
Post / EVSE Identifier #35ES*PWH*EPADALCKEM00992
Post / EVSE Identifier #362
Post / EVSE Identifier #37UK8JSSCTPOA3VDD6QIOKS7GHTX5
Post / EVSE Identifier #38ES*PWH*EPADALCKEM00993
Post / EVSE Identifier #393

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.529142 | Lon: -3.640267View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
2.5 km away

M-ALCOBENDAS-008

Marquesa Viuda Aldama,50
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
7 kW(Standard)
2.8 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.