120 kW• FastHorario habitualActive in MITECO registry

CLUB DE GOLF MEDITERRÁNEO

URBANIZACIÓN A COMA FASE 1, 282, Borriol (12190), Castellón/Castelló, Spain
Network OperatorREMO SUSTAINABLE MOBILITY S.L
Total Capacity2 bays (4 plugs)
GPS Coordinates40.03061, -0.04995
Official ID2024003454
Official Registry DateApr 18, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Borriol, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the REMO SUSTAINABLE MOBILITY S.L network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
2Charging Bay #2
2 connectors available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:200 A
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:200 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003454
Post / EVSE Identifier #1COD20240000030382PR00008417
Post / EVSE Identifier #2ES*RSM*E000000000067
Post / EVSE Identifier #35995
Post / EVSE Identifier #44190
Post / EVSE Identifier #5COD20240000030383PR00008418
Post / EVSE Identifier #6ES*RSM*E000000000066
Post / EVSE Identifier #73806
Post / EVSE Identifier #84447

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

Jueves (08:00 - 21:30) Martes (08:00 - 21:30) Lunes (08:00 - 21:30) Miercoles (08:00 - 21:30) Domingo (08:00 - 21:30) Viernes (08:00 - 21:30) Sabado (08:00 - 21:30)

Supported Payment Methods

✓PAGO CON TARJETA DE DÉBITO
✓COMPATIBLE CON TARJETAS CONTACTLESS
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.0306081 | Lon: -0.0499535View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
2.9 km away

Castellón, Spain

Partida Bovalar, 57
Operator:Tesla Spain SLU
CCS Combo 2
12 points • 12 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.