50 kW• Fast🏬Centro ComercialHorario habitualActive in MITECO registry

Centro Comercial The Corner - Adeje

Pl. Playas Del Duque 10, Adeje (38660), Santa Cruz de Tenerife, Spain
Network OperatorPunto Recargas SL
Total Capacity5 bays (5 plugs)
GPS Coordinates28.09087, -16.74137
Official IDFAGPK7CYBNKXLBZEEMQE
Official Registry DateJun 02, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Adeje, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CCS Combo 2
⚡ 800V50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:63 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
5Charging Bay #5
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeFAGPK7CYBNKXLBZEEMQE
Post / EVSE Identifier #1MWPWNB281TRRMI72WU0PPGMLDQ9
Post / EVSE Identifier #2ES*PWH*ECORTENDEL00101
Post / EVSE Identifier #31
Post / EVSE Identifier #4MYA9FJRILAUCAKEJ65PKUM3WFVR
Post / EVSE Identifier #5ES*PWH*ECORTENDEL00102
Post / EVSE Identifier #62
Post / EVSE Identifier #7KUORZQJTYVGNZAKNC8DOEFZVJT5
Post / EVSE Identifier #8ES*PWH*ECORTENDEL00103
Post / EVSE Identifier #93
Post / EVSE Identifier #10SD9EYQSTKMTO1G2LWDL2TRU1PPX
Post / EVSE Identifier #11ES*PWH*ECORTENALF03431
Post / EVSE Identifier #12TECGI31KXY5KIGFMGV6DYNJUXVQ
Post / EVSE Identifier #13ES*PWH*ECORTENALF03432

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Lunes (07:00 - 23:59) Martes (07:00 - 23:59) Miercoles (07:00 - 23:59) Jueves (07:00 - 23:59) Sabado (07:00 - 23:59) Viernes (07:00 - 23:59) Domingo (07:00 - 23:59)

Supported Payment Methods

🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.090867 | Lon: -16.741372View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)🏨Hotel / Alojamiento
350 m away

E-TF-Adeje-002

Paris Hotel Jard Nivaria,N/A
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
440 m away

62020013930041

C. Roque Nublo, 1, 38670 Costa Adeje, Santa
Operator:ENDESA X WAY, S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)🏨Hotel / Alojamiento
930 m away

Hotel Tivoli La Caleta

C. La Enramada, 9
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
7 points • 7 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.