150 kW• Ultra-fast🏬Centro Comercial24/7Active in MITECO registry

Centro Comercial Luz del Tajo

Av. Río Boladiez S/N, Toledo (45007), Toledo, Spain
Network OperatorPunto Recargas SL
Total Capacity18 bays (18 plugs)
GPS Coordinates39.86216, -3.97580
Official IDIIHY7R0QL2VF3M7SPMX8
Official Registry DateMay 19, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Toledo, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the Punto Recargas SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
5Charging Bay #5
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
6Charging Bay #6
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
7Charging Bay #7
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
8Charging Bay #8
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
9Charging Bay #9
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
10Charging Bay #10
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
11Charging Bay #11
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
12Charging Bay #12
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
13Charging Bay #13
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
14Charging Bay #14
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
15Charging Bay #15
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
16Charging Bay #16
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
17Charging Bay #17
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A
18Charging Bay #18
1 connector available
CCS Combo 2
150 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:300 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeIIHY7R0QL2VF3M7SPMX8
Post / EVSE Identifier #1ZMEMOBLT9R3NMXGPUNY5VGAWB3N
Post / EVSE Identifier #2ES*PWH*ELUZTOLALF02791
Post / EVSE Identifier #31
Post / EVSE Identifier #41G0NWSHVWRYRB2E4QFWC9COCSVI
Post / EVSE Identifier #5ES*PWH*ELUZTOLALF02792
Post / EVSE Identifier #62
Post / EVSE Identifier #7B2RKWJY1L3DOKNMAP0HHAVDEU2T
Post / EVSE Identifier #8ES*PWH*ELUZTOLKEM00691
Post / EVSE Identifier #98QU1TAHV4AIHVNXFRPV5PLZBOTJ
Post / EVSE Identifier #10ES*PWH*ELUZTOLKEM00692
Post / EVSE Identifier #11QMVMTIFEU1VZU9RXSX4A1VXUB8T
Post / EVSE Identifier #12ES*PWH*ELUZTOLKEM00693
Post / EVSE Identifier #133
Post / EVSE Identifier #140U77SA3XGLYBRJ8EAKMFFO0KP3A
Post / EVSE Identifier #15ES*PWH*ELUZTOLKEM00694
Post / EVSE Identifier #164
Post / EVSE Identifier #17KXYAH9LDAKVLYWBO1EWPRKLRJ1H
Post / EVSE Identifier #18ES*PWH*ELUZTOLKEM00695
Post / EVSE Identifier #195
Post / EVSE Identifier #20MOMNGE9I37SM4EK1D5ADOWVSWXZ
Post / EVSE Identifier #21ES*PWH*ELUZTOLKEM00696
Post / EVSE Identifier #226
Post / EVSE Identifier #23GTYZA2T9LPIKLXLUFHOTAKJXMMJ
Post / EVSE Identifier #24ES*PWH*ELUZTOLKEM00697
Post / EVSE Identifier #257
Post / EVSE Identifier #26X7NWD1MGHY7BIOZBFZLUCAABKZF
Post / EVSE Identifier #27ES*PWH*ELUZTOLKEM00698
Post / EVSE Identifier #288
Post / EVSE Identifier #29CW1V78F5ROLZVBP17A10O8KXFVW
Post / EVSE Identifier #30ES*PWH*ELUZTOLKEM00701
Post / EVSE Identifier #31PJZPUFDOOWNDSISMLHD9Q6X4WVA
Post / EVSE Identifier #32ES*PWH*ELUZTOLKEM00702
Post / EVSE Identifier #33C3SU1UVAWGQDVVWWTJT23EYTRJU
Post / EVSE Identifier #34ES*PWH*ELUZTOLKEM00703
Post / EVSE Identifier #35UNCKGIWYVZDWCWIUNX5AXML1F3O
Post / EVSE Identifier #36ES*PWH*ELUZTOLKEM00704
Post / EVSE Identifier #371OY1K6Q2NF00IEA7QOZDMQAGYZL
Post / EVSE Identifier #38ES*PWH*ELUZTOLKEM00705
Post / EVSE Identifier #39NAVVVQGCTEFBXESQGGMLVR0XZQU
Post / EVSE Identifier #40ES*PWH*ELUZTOLKEM00706
Post / EVSE Identifier #41QE199KLUTLTZQLDR5OP3ISGCYJ3
Post / EVSE Identifier #42ES*PWH*ELUZTOLKEM00707
Post / EVSE Identifier #43ZC3RZB3X76NWANOQCRO8TCQUUVU
Post / EVSE Identifier #44ES*PWH*ELUZTOLKEM00708

Theoretical Charging Times at Maximum Power (150 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~8 min(~0.1 hours)
40 kWh Battery~16 min(~0.3 hours)
60 kWh Battery~24 min(~0.4 hours)
80 kWh Battery~32 min(~0.5 hours)

Opening Hours

24/7

Supported Payment Methods

🔓Remote plug unlock supported
📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.862164 | Lon: -3.9758View on OpenStreetMap →

Other Nearby Charging Stations

250 kW(Ultra-fast)
190 m away

Toledo, Spain

Av. Del Río Boladiez
Operator:Tesla Spain SLU
CCS Combo 2
8 points • 8 plugs
Details
11 kW(Semi-fast)
1.5 km away

NUEVO HOSPITAL DE TOLEDO

AVENIDA DEL RIO GUADIANA, SN
Operator:REMO SUSTAINABLE MOBILITY S.L
Tipo 2 (Mennekes)
34 points • 34 plugs
Details
60 kW(Fast)
1.6 km away

US_55_Toledo_II

Calle Río Jarama
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.