22.17 kW• Semi-fast🏬Centro Comercial24/7Active in MITECO registry

CC Enlace - Rotonda Mercatenerife

Parque Comercial El Enlace s\n Santa Cruz de Tenerife, Santa Cruz de Tenerife (38110), Santa Cruz de Tenerife, Spain
Network OperatorATENCO ENERGIA, SL
Total Capacity5 bays (7 plugs)
GPS Coordinates28.44454, -16.27869
Official ID2024004922
Official Registry DateSep 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Santa Cruz de Tenerife, belonging to the province of Santa Cruz de Tenerife (Canarias, Spain). The charging equipment and commercial operation belong to the ATENCO ENERGIA, SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
2 connectors available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
5Charging Bay #5
2 connectors available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004922
Post / EVSE Identifier #1COD20240000040544PR00012743
Post / EVSE Identifier #2ES*CAN*E4904
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000040545PR00012744
Post / EVSE Identifier #5ES*CAN*E4905
Post / EVSE Identifier #6COD20240000040546PR00012745
Post / EVSE Identifier #7ES*CAN*E4906
Post / EVSE Identifier #8COD20240000040547PR00012746
Post / EVSE Identifier #9ES*CAN*E4907
Post / EVSE Identifier #102
Post / EVSE Identifier #11COD20240000040548PR00012747
Post / EVSE Identifier #12ES*CAN*E4908

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Accessibility: SI. Additional amenities: CENTRO COMERCIAL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.444537 | Lon: -16.278694View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.8 km away

DISA VIA PENETRACION

Avda. Via Penetracion Pk.0, 184
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
3 points • 3 plugs
Details
22 kW(Semi-fast)
2.1 km away

E-TF-LaLaguna-002

De Los Majuelos,S/N
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.