200 kW• Ultra-fast24/7Active in MITECO registry

Casintra

Poligono Granda Este 1, Siero (33199), Asturias, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity3 bays (6 plugs)
GPS Coordinates43.38382, -5.75860
Official ID2023002275
Official Registry DateNov 13, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Siero, belonging to the province of Asturias (Asturias, Principado de, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
3 connectors available
Tipo 2 (Mennekes)
50 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
Tipo 2 (Mennekes)
43 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:63 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
2 connectors available
CCS Combo 2
⚡ 800V200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:250 A
CCS Combo 2
⚡ 800V200 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002275
Post / EVSE Identifier #1COD20230000011613PR00000629
Post / EVSE Identifier #2ES*EDP*E00227
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #53
Post / EVSE Identifier #6COD20230000011614PR00000630
Post / EVSE Identifier #7ES*EDP*E00238
Post / EVSE Identifier #8COD20240000045467PR00017410
Post / EVSE Identifier #9ES*EDP*E01456

Theoretical Charging Times at Maximum Power (200 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~6 min(~0.1 hours)
40 kWh Battery~12 min(~0.2 hours)
60 kWh Battery~18 min(~0.3 hours)
80 kWh Battery~24 min(~0.4 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.383819 | Lon: -5.758603View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
3.9 km away

E-33-Amieva-001

Autovia A,66
Operator:IBERDROLA CLIENTES S.A.U
Schuko (Enchufe doméstico)Tipo 2 (Mennekes)
2 points • 4 plugs
Details
320 kW(Ultra-fast)
4.8 km away

Centro Porsche Asturias CP 2

Pol. Industrial Los Peñones 18
Operator:Ibérica de Tecnología y Servicios de Automoción, S.L.
CCS Combo 2
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.