350 kW• Ultra-fast24/7Active in MITECO registry

Campo de las Naciones

Corralejos, Madrid (28042), Madrid, Spain
Network OperatorIONITY GmbH Sucursal en España
Total Capacity2 bays (2 plugs)
GPS Coordinates40.45856, -3.61663
Official ID2024003518
Official Registry DateMay 09, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the IONITY GmbH Sucursal en España network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V350 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:800 V (Alta Tensión)
Amperage:438 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003518
Post / EVSE Identifier #1COD20240000031446PR00008570
Post / EVSE Identifier #2ES*IOY*E420802
Post / EVSE Identifier #32a6e15e4-4430-485e-91a7-18eb98da8b6e
Post / EVSE Identifier #4COD20240000031447PR00008571
Post / EVSE Identifier #5ES*IOY*E420801
Post / EVSE Identifier #601463ba8-0671-4745-9b99-7b2860986d5d

Theoretical Charging Times at Maximum Power (350 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~3 min(~0.1 hours)
40 kWh Battery~7 min(~0.1 hours)
60 kWh Battery~10 min(~0.2 hours)
80 kWh Battery~14 min(~0.2 hours)

Opening Hours

Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Sabado (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.458564 | Lon: -3.616632View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
5.4 km away

M-ALCOBENDAS-009

Encinar De Los Reyes,2
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
7 kW(Standard)
6.5 km away

M-ALCOBENDAS-008

Marquesa Viuda Aldama,50
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.