22 kW• Semi-fast24/7Active in MITECO registry

Calle la Gabarra - Paseo del Charco

Calle La Gabarra / Paseo Del Charco, Aldea de San Nicolás, La (35479), Palmas, Las, Spain
Network OperatorConsejo Insular de la Energía de Gran Canaria
Total Capacity4 bays (4 plugs)
GPS Coordinates28.00443, -15.81688
Official IDR5TXY8YUFS14M0LJ9BDI
Official Registry DateJun 13, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Aldea de San Nicolás, La, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the Consejo Insular de la Energía de Gran Canaria network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
3Charging Bay #3
1 connector available
Schuko (Enchufe doméstico)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
4Charging Bay #4
1 connector available
Schuko (Enchufe doméstico)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeR5TXY8YUFS14M0LJ9BDI
Post / EVSE Identifier #1LGILVP5NL3EFLF9G3JL7PRZW1LX
Post / EVSE Identifier #2ES*MGC*ECIEGC0042*2
Post / EVSE Identifier #3a85aa970-b6af-11ee-a48e-abad0485f94f
Post / EVSE Identifier #4UBD8D1LX8AUF1XWRPWVYXJ1Z1TV
Post / EVSE Identifier #5ES*MGC*ECIEGC0042*3
Post / EVSE Identifier #60YQPIWGU0BR8KOQ0WI9JU5FWODL
Post / EVSE Identifier #7ES*MGC*ECIEGC0042*4
Post / EVSE Identifier #8JHQIDGMB7BIF21P2D9RAGZKFZEK
Post / EVSE Identifier #9ES*MGC*ECIEGC0042*1

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

✓PERFIL DE CARGA ADMITIDO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.0044332 | Lon: -15.8168818View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
15.0 km away

C- Cairasco de Figueroa

Calle Cairasco De Figueroa 15
Operator:Consejo Insular de la Energía de Gran Canaria
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)
15.6 km away

62130031400018

Barcelo Roca Negra - Av. Alfredo Kraus, 42,
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
50 kW(Fast)⛽Estación BP
15.6 km away

61946054450004

Bp Agaete - Calle León Y Castillo, 47
Operator:ENDESA X WAY, S.L.
CCS Combo 2CHAdeMOTipo 2 (Mennekes)
3 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.