180 kW• Ultra-fast24/7Active in MITECO registry

C8A233S023ECUKCMDS

Avenida Juan Carlos I Parcela 42, 35019, Las Palmas De Gran Canaria, Spain, Palmas de Gran Canaria, Las (35019), Palmas, Las, Spain
Network OperatorCEPSA COMERCIAL PETRÓLEO,S.A.U.
Total Capacity1 bay (2 plugs)
GPS Coordinates28.11217, -15.45012
Official ID2024006757
Official Registry DateFeb 04, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Palmas de Gran Canaria, Las, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the CEPSA COMERCIAL PETRÓLEO,S.A.U. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
180 kW
Current type:Direct Current (DC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:250 A
CHAdeMO
180 kW
Current type:Direct Current (DC)
Format:⚠️ Socket (Bring cable)
Voltage:400 V
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006757
Post / EVSE Identifier #1COD20240000045491PR00017462
Post / EVSE Identifier #2ES*MOE*EC8A233S023ECUKCMDS
Post / EVSE Identifier #31
Post / EVSE Identifier #42

Theoretical Charging Times at Maximum Power (180 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~7 min(~0.1 hours)
40 kWh Battery~13 min(~0.2 hours)
60 kWh Battery~20 min(~0.3 hours)
80 kWh Battery~27 min(~0.4 hours)

Opening Hours

Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

✓COMPATIBLE CON TARJETAS CON CHIP
✓COMPATIBLE CON TARJETAS CONTACTLESS
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 28.11217 | Lon: -15.45012View on OpenStreetMap →

Other Nearby Charging Stations

300 kW(Ultra-fast)
1.2 km away

HYC23BZ0033B-

Av. Escaleritas, 152, 35011, Las Palmas De Gran Canaria, Las Palmas, Spain
Operator:CEPSA COMERCIAL PETRÓLEO,S.A.U.
CCS Combo 2CHAdeMO
1 point • 2 plugs
Details
50 kW(Fast)
1.7 km away

E.S. DISA MILLER BAJO

C/ LUIS CORREA MEDINA, 19
Operator:SOCIEDAD COOPERATIVA DE PRODUCTORES TAXISTAS DE LAS PALMAS
Tipo 2 (Mennekes)
1 point • 1 plug
Details
203 kW(Ultra-fast)⛽Gasolinera Petroprix
1.8 km away

Petroprix Las Palmas III

Calle Eufemiano Fuentes Cabrera 4
Operator:EDP CLIENTES SAU
CCS Combo 2
1 point • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.