22.17 kW• Semi-fast24/7Active in MITECO registry

C/ De Londres Nº3 Ayto. Torrejón de Ardoz

C. De Londres, Nº3, Torrejón de Ardoz (28850), Madrid, Spain
Network OperatorFERROVIAL CONSTRUCCIÓN S.A.
Total Capacity1 bay (2 plugs)
GPS Coordinates40.46015, -3.47411
Official ID2024003601
Official Registry DateJun 03, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Torrejón de Ardoz, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the FERROVIAL CONSTRUCCIÓN S.A. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Tipo 2 (Mennekes)
22.17 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024003601
Post / EVSE Identifier #1COD20240000032714PR00008797
Post / EVSE Identifier #2ES*FES*E13492
Post / EVSE Identifier #32
Post / EVSE Identifier #41

Theoretical Charging Times at Maximum Power (22.17 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~54 min(~0.9 hours)
40 kWh Battery~1 h 48 min(~1.8 hours)
60 kWh Battery~2 h 42 min(~2.7 hours)
80 kWh Battery~3 h 37 min(~3.6 hours)

Opening Hours

Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Viernes (00:00 - 23:59) Jueves (00:00 - 23:59) Miercoles (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.460149 | Lon: -3.474109View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
5.6 km away

M-Paracuellos-001

Juan Pablo Ii,46
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
50 kW(Fast)
8.2 km away

M-Mejorada-001

Esla,2
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
4 points • 5 plugs
Details
50 kW(Fast)
12.2 km away

M-Madrid-023

Partenón,5
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
34 points • 38 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.