100 kW• Fast24/7Active in MITECO registry

Burger King Maspalomas

Alcalde Marcial Franco,15, Ingenio (35100), Palmas, Las, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity2 bays (3 plugs)
GPS Coordinates27.76437, -15.57866
Official IDRWDFDBWYNFAXE6QISZDW
Official Registry DateOct 31, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ingenio, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
2 connectors available
CHAdeMO
80 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:200 A
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeRWDFDBWYNFAXE6QISZDW
Post / EVSE Identifier #1C5FUBC1O5DBOJROPGTIQXRPAZW8
Post / EVSE Identifier #2ES*FCT*E229765
Post / EVSE Identifier #3241872
Post / EVSE Identifier #4JPIMWYGJ4BFKDBTPEKDOUA9GPEY
Post / EVSE Identifier #5ES*FCT*E229766
Post / EVSE Identifier #6241873
Post / EVSE Identifier #7241874

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 27.764365 | Lon: -15.578663View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)⛽Estación Shell
10.4 km away

SHELL JUAN GRANDE

Autopista Gc-, Km 34, 6
Operator:Prio Recharge Sl.
CCS Combo 2
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.