120 kW• FastHorario habitualActive in MITECO registry

BI-Gorliz-003

Pol Sagastikoetxe Manzana,1, Gorliz (48630), Bizkaia, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity4 bays (4 plugs)
GPS Coordinates43.40588, -2.93118
Official IDW8CCSTY9XTC8WD387YYW
Official Registry DateJul 18, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Gorliz, belonging to the province of Bizkaia (País Vasco, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V120 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:1000 V (Alta Tensión)
Amperage:400 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A
4Charging Bay #4
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeW8CCSTY9XTC8WD387YYW
Post / EVSE Identifier #1131YMZUJKP3DTXOP8Z85GRXMBNZ
Post / EVSE Identifier #2ES*IBD*E396537
Post / EVSE Identifier #3309747
Post / EVSE Identifier #4ZG9VFKA6B5UX1IS9BPIXAHXBKYO
Post / EVSE Identifier #5ES*IBD*E396538
Post / EVSE Identifier #6309748
Post / EVSE Identifier #7OASNY8XELK0I6VCJXO3CARH7XBD
Post / EVSE Identifier #8ES*IBD*E396535
Post / EVSE Identifier #9309745
Post / EVSE Identifier #10ZNXFNM872VHWUULZW0OQOHRXLJU
Post / EVSE Identifier #11ES*IBD*E396536
Post / EVSE Identifier #12309746

Theoretical Charging Times at Maximum Power (120 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~10 min(~0.2 hours)
40 kWh Battery~20 min(~0.3 hours)
60 kWh Battery~30 min(~0.5 hours)
80 kWh Battery~40 min(~0.7 hours)

Opening Hours

Martes (09:00 - 21:30) Miercoles (09:00 - 21:30) Viernes (09:00 - 21:30) Lunes (09:00 - 21:30) Jueves (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 43.4058818 | Lon: -2.9311845View on OpenStreetMap →

Other Nearby Charging Stations

7 kW(Standard)
5.1 km away

BI-Sopelana-001

Aldeko,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
6 points • 6 plugs
Details
50 kW(Fast)
6.8 km away

BI-Berango-001

Sabino Arana Zeharbide,50
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
22 kW(Semi-fast)
11.7 km away

BI-Santurtzi-001

Puerto Pesquero,9
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.