22 kW• Semi-fast24/7Active in MITECO registry

Avenida del Polizón 98, Arinaga

Avenida Del Polizón 98, Arinaga, Agüimes (35118), Palmas, Las, Spain
Network OperatorConsejo Insular de la Energía de Gran Canaria
Total Capacity1 bay (1 plug)
GPS Coordinates27.85856, -15.39752
Official IDGHYB7IEV3FXFCEBVXXOX
Official Registry DateOct 03, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Agüimes, belonging to the province of Palmas, Las (Canarias, Spain). The charging equipment and commercial operation belong to the Consejo Insular de la Energía de Gran Canaria network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
22 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeGHYB7IEV3FXFCEBVXXOX
Post / EVSE Identifier #1BN8WOA2RUYJLGOZ7FZNWEYFLUSM
Post / EVSE Identifier #2ES*MGC*ECIEGC00561
Post / EVSE Identifier #3aeb852e1-e37a-4e31-867f-791c28161d2d

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 27.8585595 | Lon: -15.3975174View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
1.8 km away

US_246_Agüimes

Calle Escorpiones
Operator:PLENOIL CANARIAS, S.L.U.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
22 kW(Semi-fast)
3.4 km away

E-GC-Aguimes-001

Almendro,25
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
4 points • 4 plugs
Details
22 kW(Semi-fast)
4.5 km away

DISA AUTOPISTA 21

Autopista Gc-1, Km 21, 5
Operator:Prio Recharge Sl.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.