Avenida Abrantes

Avenida Abrantes, 57, Madrid (28025), Madrid, Spain
Network OperatorTotalEnergies Charging Services España, SLU
Total Capacity7 bays (7 plugs)
GPS Coordinates40.38112, -3.72758
Official IDWUGFANEGTZ4RCTWFXRJW
Official Registry DateFeb 18, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Madrid, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the TotalEnergies Charging Services España, SLU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
2Charging Bay #2
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
3Charging Bay #3
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
4Charging Bay #4
1 connector available
CCS Combo 2
100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:250 A
5Charging Bay #5
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
6Charging Bay #6
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
7Charging Bay #7
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeWUGFANEGTZ4RCTWFXRJW
Post / EVSE Identifier #1M38S1JYNO4SNUKKTQSPWPOW5OMW
Post / EVSE Identifier #2ES*TCB*E000107
Post / EVSE Identifier #31
Post / EVSE Identifier #4Y4KRWHMAOO9W2WPFZR0ULZQKZG4
Post / EVSE Identifier #5ES*TCB*E000108
Post / EVSE Identifier #6IBA1UNUGTZM5RAQSE1EFTPWX69R
Post / EVSE Identifier #7ES*TCB*E000110
Post / EVSE Identifier #8LHQDZJB38T0NRW2W630RINFMM01
Post / EVSE Identifier #9ES*TCB*E000109
Post / EVSE Identifier #10DNCHOP6W1AFIDBJYHBCJBAUXOR4
Post / EVSE Identifier #11ES*TCB*E000112
Post / EVSE Identifier #120Y4DAGO8WND9GPPEUHHRUUJHT9L
Post / EVSE Identifier #13ES*TCB*E000113
Post / EVSE Identifier #14WN8KAK4FPSI5TNQS5SHJA7LX6IW
Post / EVSE Identifier #15ES*TCB*E000111

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Public hours not specified

Supported Payment Methods

✓PAGO CON TARJETA DE CRÉDITO
💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.38112 | Lon: -3.72758View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.0 km away

M-Madrid-078

Hilario Herranz Establos,24
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2
2 points • 3 plugs
Details
50 kW(Fast)
4.2 km away

M-Madrid-042

Aviacion,20
Operator:IBERDROLA CLIENTES S.A.U
CCS Combo 2CHAdeMO
2 points • 3 plugs
Details
50 kW(Fast)
4.3 km away

M-MADRID-011

Sinfonia,9
Operator:IBERDROLA CLIENTES S.A.U
CHAdeMOCCS Combo 2Tipo 2 (Mennekes)
2 points • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.