100 kW• Fast24/7Active in MITECO registry

AV-AVILA-006

Santa Ana,7, Ávila (05001), Ávila, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (3 plugs)
GPS Coordinates40.65555, -4.69010
Official ID2024000042
Official Registry DateJan 19, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Ávila, belonging to the province of Ávila (Castilla y León, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000042
Post / EVSE Identifier #1COD20240000017417PR00000132
Post / EVSE Identifier #2ES*IBD*E211671
Post / EVSE Identifier #3223355
Post / EVSE Identifier #4223354
Post / EVSE Identifier #5COD20240000017418PR00000133
Post / EVSE Identifier #6ES*IBD*E211692
Post / EVSE Identifier #7223356

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Miercoles (00:00 - 23:59) Martes (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59) Lunes (00:00 - 23:59) Domingo (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.655552 | Lon: -4.690103View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
480 m away

AV-AVILA-012

Portugal,1
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
22 kW(Semi-fast)
550 m away

Telpark - El Grande

Pza. De Santa Teresa, S/N
Operator:MAKSU ESPAÑA SL
Tipo 2 (Mennekes)
7 points • 7 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.