7.4 kW• Semi-fast24/7Active in MITECO registry

APK2 Serrallo - Tarragona

Moll De La Costa, Tarragona (43004), Tarragona, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity2 bays (2 plugs)
GPS Coordinates41.11035, 1.24473
Official ID2023002318
Official Registry DateAug 31, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Tarragona, belonging to the province of Tarragona (Cataluña, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
7.4 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002318
Post / EVSE Identifier #1COD20230000011708PR00000724
Post / EVSE Identifier #2ES*EDP*E00514
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20230000011709PR00000725
Post / EVSE Identifier #5ES*EDP*E00515

Theoretical Charging Times at Maximum Power (7.4 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~2 h 42 min(~2.7 hours)
40 kWh Battery~5 h 24 min(~5.4 hours)
60 kWh Battery~8 h 6 min(~8.1 hours)
80 kWh Battery~10 h 49 min(~10.8 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.11035 | Lon: 1.244725View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)🏬Centro Comercial
910 m away

Centro Comercial Parc Central

Av. De Ramón Y Cajal, 69, 43005 Tarragona, S
Operator:Punto Recargas SL
Tipo 2 (Mennekes)
9 points • 9 plugs
Details
22 kW(Semi-fast)🅿️Parking
940 m away

RAMBLA NOVA

Rambla Nova, S/N (Parking Balcó del Mediterrani)
Operator:PAVAPARK MOVILIDAD SL
Tipo 2 (Mennekes)
2 points • 4 plugs
Details
22 kW(Semi-fast)🅿️Parking
1.2 km away

PLAZA DE LA FONT

Plaça de la Font (Parking subterráneo
Operator:PAVAPARK MOVILIDAD SL
Tipo 2 (Mennekes)
2 points • 4 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.