50 kW• Fast24/7Active in MITECO registry

Allego NISSAN KENTO MOTOR, S.L.

Ctra. Madrid Toledo, Km. 63,8, Olías del Rey (45280), Toledo, Spain
Network OperatorAllego Spain S.L.U
Total Capacity2 bays (2 plugs)
GPS Coordinates39.90961, -4.01089
Official ID2024000817
Official Registry DateFeb 13, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Olías del Rey, belonging to the province of Toledo (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the Allego Spain S.L.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:400 V
Amperage:125 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024000817
Post / EVSE Identifier #1COD20240000023030PR00002382
Post / EVSE Identifier #2ES*ALL*EGO0001701
Post / EVSE Identifier #31
Post / EVSE Identifier #4COD20240000023031PR00002383
Post / EVSE Identifier #5ES*ALL*EGO0001702
Post / EVSE Identifier #62

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Sabado (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Domingo (00:00 - 23:59) Miercoles (00:00 - 23:59)

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.909614 | Lon: -4.010892View on OpenStreetMap →

Other Nearby Charging Stations

22 kW(Semi-fast)
4.1 km away

RTVE_Toledo

C. De París, 15
Operator:WENEA EMOBILITY SERVICES S.L.
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
60 kW(Fast)
4.6 km away

US_286_Toledo

Calle Concilio De Toledo
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.