22 kW• Semi-fast24/7Active in MITECO registry

Aldea del Fresno

Carr. De Madrid 61, Aldea del Fresno (28620), Madrid, Spain
Network OperatorEDP CLIENTES SAU
Total Capacity2 bays (4 plugs)
GPS Coordinates40.32256, -4.19766
Official ID2023002383
Official Registry DateAug 31, 2023

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Aldea del Fresno, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the EDP CLIENTES SAU network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2023002383
Post / EVSE Identifier #1COD20230000011827PR00000843
Post / EVSE Identifier #2ES*EDP*E00793
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20230000011828PR00000844
Post / EVSE Identifier #6ES*EDP*E00794

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Accessibility: SI. Additional amenities: SUPERMERCADO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.322559 | Lon: -4.197662View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
7.7 km away

US_408_Navas_del_Rey

Paseo De La Cañada Del Fraile
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.