100 kW• Fast24/7Active in MITECO registry

Alcobendas - Valdelasfuentes estación de tren

Del Marqués De La Valdavia,103, Alcobendas (28100), Madrid, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity3 bays (3 plugs)
GPS Coordinates40.54663, -3.65343
Official IDPUNKWFTJXDLCYIXUZAD2
Official Registry DateSep 30, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcobendas, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodePUNKWFTJXDLCYIXUZAD2
Post / EVSE Identifier #1JCEPKCHD6W4IZ3PQZKZAZ3RG9EH
Post / EVSE Identifier #2ES*FCT*E230255
Post / EVSE Identifier #3242404
Post / EVSE Identifier #4P6CHUJGS5AIAWUUBJPRFYCKNKPL
Post / EVSE Identifier #5ES*FCT*E230256
Post / EVSE Identifier #6242405
Post / EVSE Identifier #7JTTA8MJXWQ9WNJAHUCMCOMJQ116
Post / EVSE Identifier #8ES*FCT*E230257
Post / EVSE Identifier #9242406

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.546633 | Lon: -3.653433View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.