100 kW• Fast24/7Active in MITECO registry

Alcobendas - C. de la Constitución, 106

C. De La Constitución,106, Alcobendas (28100), Madrid, Spain
Network OperatorCHARGING TOGETHER SL
Total Capacity3 bays (3 plugs)
GPS Coordinates40.54721, -3.64521
Official ID2YLUPQVP4YSPKS3J4NO0
Official Registry DateMar 02, 2026

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Alcobendas, belonging to the province of Madrid (Madrid, Comunidad de, Spain). The charging equipment and commercial operation belong to the CHARGING TOGETHER SL network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
3Charging Bay #3
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Voltage:230 V
Amperage:32 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2YLUPQVP4YSPKS3J4NO0
Post / EVSE Identifier #1EQ8R6RU5NLJXETRTHCYZ3GIWQVX
Post / EVSE Identifier #2ES*FCT*E231210
Post / EVSE Identifier #3243462
Post / EVSE Identifier #44EIAZO48SDBUSPIGRKQP0AADXXQ
Post / EVSE Identifier #5ES*FCT*E231211
Post / EVSE Identifier #6243463
Post / EVSE Identifier #7GDL793WCK2PCH8EIBLZJTZTMLHX
Post / EVSE Identifier #8ES*FCT*E231212
Post / EVSE Identifier #9243464

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

24/7

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
💳RFID Card / Keyfob reader

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 40.547206 | Lon: -3.645207View on OpenStreetMap →

Other Nearby Charging Stations

Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.