22 kW• Semi-fast24/7Active in MITECO registry

ACCIONA - QWELLO Onda Montí

Plaza Montí, 2, Onda (12200), Castellón/Castelló, Spain
Network OperatorINFRAESTRUCTURAS DE MOVILIDAD URBANA Y SOSTENIBLE AQ JV S.L.
Total Capacity4 bays (8 plugs)
GPS Coordinates39.96071, -0.26548
Official ID2024004827
Official Registry DateAug 08, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Onda, belonging to the province of Castellón/Castelló (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the INFRAESTRUCTURAS DE MOVILIDAD URBANA Y SOSTENIBLE AQ JV S.L. network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
2Charging Bay #2
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
3Charging Bay #3
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A
4Charging Bay #4
2 connectors available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Amperage:32 A
Tipo 2 (Mennekes)
11 kW
Current type:Alternating Current (AC)
Format:✓ Tethered Cable
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004827
Post / EVSE Identifier #1COD20240000039393PR00012523
Post / EVSE Identifier #2ES*AEQ*EGH4W411
Post / EVSE Identifier #31
Post / EVSE Identifier #42
Post / EVSE Identifier #5COD20240000039394PR00012524
Post / EVSE Identifier #6ES*AEQ*EGH4W421
Post / EVSE Identifier #7COD20240000039395PR00012525
Post / EVSE Identifier #8ES*AEQ*EGH4W431
Post / EVSE Identifier #9COD20240000039396PR00012526
Post / EVSE Identifier #10ES*AEQ*EGH4W441

Theoretical Charging Times at Maximum Power (22 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~55 min(~0.9 hours)
40 kWh Battery~1 h 49 min(~1.8 hours)
60 kWh Battery~2 h 44 min(~2.7 hours)
80 kWh Battery~3 h 38 min(~3.6 hours)

Opening Hours

24/7

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE DÉBITO
✓PAGO CON TARJETA DE CRÉDITO
✓COMPATIBLE CON TARJETAS CONTACTLESS
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access. Additional amenities: APARCAMIENTO

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 39.960712 | Lon: -0.265475View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
1.4 km away

US_316_Onda

C/ Llucena
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
100 kW(Fast)
2.1 km away

Burger King Onda

Carretera Cv-20 Vila-Real Onda,59
Operator:CHARGING TOGETHER SL
CCS Combo 2
2 points • 2 plugs
Details
120 kW(Fast)🛒Supermercado Consum
13.2 km away

CONSUM L´ALCORA

Calle Vinyals,1
Operator:REMO SUSTAINABLE MOBILITY S.L
CCS Combo 2Tipo 2 (Mennekes)
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.