50 kW• Fast24/7Active in MITECO registry

ACCIONA - Mesón Las Tres Chimeneas

Carretera Zamora, Km 44, Villar del Buey (49230), Zamora, Spain
Network OperatorACCIONA Recarga
Total Capacity2 bays (3 plugs)
GPS Coordinates41.32409, -6.30581
Official ID2024006478
Official Registry DateOct 24, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Villar del Buey, belonging to the province of Zamora (Castilla y León, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
2 connectors available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
CHAdeMO
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:125 A
2Charging Bay #2
1 connector available
Tipo 2 (Mennekes)
22 kW
Current type:Alternating Current (AC)
Format:⚠️ Socket (Bring cable)
Voltage:380 V
Amperage:16 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024006478
Post / EVSE Identifier #1COD20240000044560PR00016575
Post / EVSE Identifier #2ES*ARE*ETF1HYIL7UW3H7601ICKG
Post / EVSE Identifier #35b9247e28636fa39f4adb810
Post / EVSE Identifier #45b9247e28636fa39f4adb80e
Post / EVSE Identifier #5COD20240000044561PR00016576
Post / EVSE Identifier #6ES*ARE*EQ59MSBRU3GEGORGBHGBQ
Post / EVSE Identifier #75b9247e28636fa39f4adb80d

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Lunes (00:00 - 23:59) Martes (00:00 - 23:59) Sabado (00:00 - 23:59) Domingo (00:00 - 23:59) Viernes (00:00 - 23:59)

Supported Payment Methods

📱Mobile App (Remote activation & eMSP roaming)
✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN

Accessibility & Amenities

Standard public access. Additional amenities: RESTAURANTE, CAFETERÍA

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.3240924 | Lon: -6.3058093View on OpenStreetMap →

Other Nearby Charging Stations

7.4 kW(Semi-fast)
7.8 km away

ZA-FERMOSELLE-001

Portal Villar,55
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)
2 points • 2 plugs
Details
7 kW(Standard)
9.4 km away

Zafararural

Pardineros 28
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)
1 point • 1 plug
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.