100 kW• Fast24/7Active in MITECO registry

ACCIONA - E.S. Sigüenza

Camino Cañada, 2, Sigüenza (19250), Guadalajara, Spain
Network OperatorACCIONA Recarga
Total Capacity2 bays (2 plugs)
GPS Coordinates41.06189, -2.64726
Official ID2024004456
Official Registry DateJun 21, 2024

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Sigüenza, belonging to the province of Guadalajara (Castilla - La Mancha, Spain). The charging equipment and commercial operation belong to the ACCIONA Recarga network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A
2Charging Bay #2
1 connector available
CCS Combo 2
⚡ 800V100 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:920 V (Alta Tensión)
Amperage:250 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO Code2024004456
Post / EVSE Identifier #1COD20240000036567PR00011702
Post / EVSE Identifier #2ES*ARE*ESRSYTNHCANAUNINS5WSW
Post / EVSE Identifier #35b9247e28636fa39f4adb810
Post / EVSE Identifier #4COD20240000036568PR00011703
Post / EVSE Identifier #5ES*ARE*E3T4K5DSRG4A0E4MGVAMR

Theoretical Charging Times at Maximum Power (100 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~12 min(~0.2 hours)
40 kWh Battery~24 min(~0.4 hours)
60 kWh Battery~36 min(~0.6 hours)
80 kWh Battery~48 min(~0.8 hours)

Opening Hours

Domingo (00:00 - 23:59) Martes (00:00 - 23:59) Lunes (00:00 - 23:59) Miercoles (00:00 - 23:59) Jueves (00:00 - 23:59) Viernes (00:00 - 23:59) Sabado (00:00 - 23:59)

Supported Payment Methods

✓CONECTOR REQUERIDO EN EL INICIO DE SESIÓN
📱Mobile App (Remote activation & eMSP roaming)

Accessibility & Amenities

Standard public access. Additional amenities: SUPERMERCADO, HOTEL, MUSEO, RESTAURANTE, CAFETERÍA, CENTRO COMERCIAL

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 41.0618919 | Lon: -2.647262View on OpenStreetMap →

Other Nearby Charging Stations

50 kW(Fast)
1.0 km away

GU-Sigüenza-001

Arcos,8
Operator:IBERDROLA CLIENTES S.A.U
Tipo 2 (Mennekes)CHAdeMOCCS Combo 2
6 points • 8 plugs
Details
180 kW(Ultra-fast)🏨Hotel / Alojamiento
10.6 km away

TotalEnergies - Hostal El Cercao

C. De D. Juan Manuel Pardo Gayoso, 2
Operator:TotalEnergies Charging Services España, SLU
CCS Combo 2Tipo 2 (Mennekes)CHAdeMO
4 points • 4 plugs
Details
40 kW(Semi-fast)⛽Estación Repsol
15.9 km away

Repsol ES, CRED Mirabueno

Cr A-2, 107 D
Operator:REPSOL SOLUCIONES ENERGÉTICAS SA
Tipo 2 (Mennekes)CCS Combo 2CHAdeMO
1 point • 3 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.