50 kW• FastHorario habitualActive in MITECO registry

A-ELDA-004

Velazquez,11, Elda (03600), Alicante/Alacant, Spain
Network OperatorIBERDROLA CLIENTES S.A.U
Total Capacity2 bays (2 plugs)
GPS Coordinates38.47162, -0.79865
Official IDBOTQKCXQSR541CQPZLA2
Official Registry DateOct 02, 2025

Entity Hierarchy & Geographical Context

This physical EV charging installation is located within the municipality of Elda, belonging to the province of Alicante/Alacant (Comunitat Valenciana, Spain). The charging equipment and commercial operation belong to the IBERDROLA CLIENTES S.A.U network.

Charging Points & Connectors Breakdown

Each physical charging station contains one or more bays equipped with various connector formats and electrical currents

1Charging Bay #1
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A
2Charging Bay #2
1 connector available
CCS Combo 2
50 kW
Current type:Direct Current (DC)
Format:✓ Tethered Cable
Voltage:500 V
Amperage:150 A

Station Identifiers & EVSE Activation Codes

To start charging from an operator app or interoperability platform (Electromaps, Miio, Place to Plug), use these official MITECO census identifiers to pinpoint the exact charging post or outlet:

Official MITECO CodeBOTQKCXQSR541CQPZLA2
Post / EVSE Identifier #1ZNZMSDWHGFQUIE8XWBW0PY2KCAC
Post / EVSE Identifier #2ES*IBD*E232728
Post / EVSE Identifier #3244929
Post / EVSE Identifier #4Z96VRFEYMZBOZPZKNUZMAJHN6NT
Post / EVSE Identifier #5ES*IBD*E232729
Post / EVSE Identifier #6244930

Theoretical Charging Times at Maximum Power (50 kW)

Mathematical estimate based on the formula hours = kWh / kW. Important: Actual charging speed depends on your vehicle acceptance rate curve, initial state of charge (SoC), battery temperature, and station dynamic load balancing.

20 kWh Battery~24 min(~0.4 hours)
40 kWh Battery~48 min(~0.8 hours)
60 kWh Battery~1 h 12 min(~1.2 hours)
80 kWh Battery~1 h 36 min(~1.6 hours)

Opening Hours

Miercoles (09:00 - 21:30) Lunes (09:00 - 21:30) Viernes (09:00 - 21:30) Jueves (09:00 - 21:30) Martes (09:00 - 21:30)

Supported Payment Methods

💳RFID Card / Keyfob reader
✓PAGO CON TARJETA DE CRÉDITO
✓PAGO CON TARJETA DE DÉBITO
📱Mobile App (Remote activation & eMSP roaming)
📅Advance slot reservation supported

Accessibility & Amenities

Standard public access.

Location Map

Interactive EV Charging Map

1 charging stations ready to explore

Lat: 38.47162 | Lon: -0.79865View on OpenStreetMap →

Other Nearby Charging Stations

60 kW(Fast)
610 m away

US_252A_Elda

Avda. Monóvar
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
60 kW(Fast)
2.2 km away

US_279_Petrer

Poligono 21 312
Operator:PLENOIL, S.L.
Tipo 2 (Mennekes)
1 point • 1 plug
Details
150 kW(Ultra-fast)🏬Centro Comercial
10.0 km away

Parque Comercial Ledua Park

Cv-820, 230, 03660 Novelda, Alicante, Spain
Operator:Punto Recargas SL
CCS Combo 2CHAdeMO
6 points • 6 plugs
Details
Data Source & Methodology
Full methodology →

This directory is an independent public portal using official open data on electric vehicle charging infrastructure published by the Ministry for Ecological Transition and the Demographic Challenge (MITECO, Government of Spain) . Displayed data corresponds to the latest consolidated registry import on 24/10/2026.

Independence & disclaimer: This directory is an independent initiative and does not represent MITECO or operating networks. Technical details (power ratings, connector availability and operating hours) are subject to real-time adjustments by individual station operators.